Case StudyOctober 12, 2026 · 1 min read

The Twenty-Minute Change That Took Two Months

How nCoder's impact analysis turned open-ended change risk in a 12-year, 400-object Salesforce org into something a reviewer could check and approve in one sitting.

Custom objects
400+
Custom objects
Engineers
14
Engineers
Org age
12 yrs
Org age
Releases
Bi-weekly
Releases

Download the Full Case Study

See how nCoder's impact analysis engine bounded an unbounded risk — and get the full case study PDF straight to your inbox.

or
Download PDF
Hands holding a glowing cloud connected to app icons

A 12-year-old Salesforce org where nobody could say "we checked everything"

The client is a global manufacturing company running a Salesforce org that's been in continuous use for 12 years — around 400 custom objects, a 14-person delivery team spread across three squads, and integrations into ERP, CPQ, and two data warehouses. Even a twenty-minute picklist change could sit on the backlog for months, because nobody could say with confidence what else it might touch.

Solution

  • Complete dependency traversal across the org's structural model — not just a keyword search
  • Every finding backed by the exact reference that produced it, so reviewers verify instead of trust
  • Indirect dependencies (flows reaching a field through automation) surfaced instead of missed
  • Natural-language queries — no query language required

Impact

  • Bounded, approvable risk instead of open-ended uncertainty
  • Backlog of deferred changes started moving again
  • Undocumented dependencies surfaced before they caused incidents

Get the full case study

Download the PDF now, or have a copy sent to your inbox.

Download PDF